Spacious standby power and UPS infrastructure with closed switchgear cabinets

If the grid fails, your operations keep running.

Standby generators and UPS systems for critical loads – designed, installed and maintained.

Range of services

Standby power & UPS

It is not only data centres that need backup power. Laboratories, medical practices with imaging equipment, production plants with long start-up times, safety and emergency lighting systems: in all of these, the power supply determines whether a mains outage costs a minute or a day.

It starts with the load schedule. We record which loads must keep running, at what power, with what starting current and for what runtime. From this we derive the apparent power of the UPS in kVA, the battery capacity and – where longer outages must be bridged – the power rating of the standby generator.

Commissioning of a building automation system in a large plant room

The UPS bridges the outage seamlessly, usually as a double-conversion unit with a battery system and bypass. We install the unit, build the battery room with ventilation, route the backed-up circuits to a dedicated distribution board and label every outgoing circuit.

For longer outages, we install the standby generator with its switchover equipment: if the grid fails, the generator set starts, the transfer switch changes the loads over, and when the grid returns, it switches back in a controlled manner. Together, the UPS and the standby generator provide a continuous supply.

Testing is done under load. We carry out the switchover, put the system through a test run and log voltage, power and switchover times. Batteries age, and generator sets stand idle: that is why the maintenance plan sets out when battery tests, test runs and inspections are due, and the operating staff are briefed on the system.

Scope of services

Full scope of services: from the load schedule to the maintenance plan.

  • Needs analysis and load schedule
  • UPS sizing in kVA
  • Battery system and battery room
  • Standby generator
  • Transfer switch
  • Distribution board for backed-up circuits
  • Test run under load
  • Maintenance plan
Services
Needs analysis and load schedule, UPS sizing, battery system, standby generator, transfer switch, test run under load, maintenance
Clients
Commerce and industry, healthcare and laboratories, public administrations, operators of critical facilities
Records
Test run report with switchover times, safety certificate under the NIV, load schedule with runtime, maintenance plan
Typical applications
Server rooms, laboratories, medical practices and clinics, production plants, safety and emergency lighting systems
Basis
Design based on load schedule and runtime · Low-Voltage Installation Ordinance (NIV, SR 734.27)

Frequently asked questions

What is the difference between a UPS and a standby generator?

The UPS bridges interruptions of seconds to minutes. In a prolonged outage, the standby generator, usually diesel-powered, takes over. Together, they ensure a continuous supply.

What does 24/7 service & maintenance cover?

Maintenance, fault service, repairs and support for data centres and critical installations – around the clock, for customers with a service contract. The scope and our availability are set out in the contract.

Do I need a safety certificate after the installation?

Yes. The Low-Voltage Installation Ordinance (NIV) requires a safety certificate for new installations and modifications. You receive it from us after acceptance.

Talk to the team that builds your network.

Electrical engineering, data centres, fibre, IT and security – across Switzerland, under one roof.

One project manager per contract. A 24/7 service number for installations with a service contract.